< Columbia Street Paving and Drainage >

 

This project was completed in 1984 for the City of Orlando. It consisted of several blocks of roadway demolition and construction from a 2 lane roadway to a 4 lane. The project included all the utilities, paving drainage and sidewalks. The project was challenging because of the very deep utility construction which required dewatering. The City was pleased with the project. Feel free to drive on the roadway and check the quality of workmanship.